Minimum documentation that has to send electrical contractor for the owner attached with the electric estimate:
-Level 3 Award in Initial and Periodic Inspection and Testing of Electrical Installation, including 3-phase, (inspector).
-Level 3 Award in the Requirements for Electrical Installations BS 7671.- Public and products Liability (insurance).

- Public and products Liability (insurance).

If you own a dwelling or flat, you must have.

Step 4.1 Initial verification, inspection and testing of the Installation:
Electrical installation Certificate.
Schedule of the inspection Generic Schedule of Test Result of each circuit.

If you own a dwelling or flat, you must have.

Step 1.4 Electrical Schedule & Electrical Estimate (quote).

 If you own a dwelling or flat, you must have.

​ Step 1.3 Location: devices, sockets, lamps. Together with the owner on the paper copy of the plans. After Drawing in de AutoCAD of devices, sockets, lamps & make schedule devices. 

If you own a dwelling or flat, you must have.

Step 3.1 Risk Assessment Form,

 Method Statement for works
 Risk Assessment. 

 Method Statements Checklist

Note: Must be check. Supply Characteristic & Earthing Arrangement, after this you can build the installation.

                                                                 HOW PROTECT YOUR INVESTMENT:

What you need to know to make your electrical installation (Electrical Project).

You need pass the building control: Electrical Installation Certificate, Emergency lighting Certificate or fire alarm system. (Electrical Wired or Rewiring).

Note: The insurance company will ask you to provide some basic requirements to enrol with them, although when you want
To claim the insurance, you must have the requirements described below to confirm that your electrical installation complies With British Standard.Why you should follow this step?.

Each step is supported on the previous

Electrical Installation services London

If you own a dwelling or flat, you must have.

Step 1.1 Architectural drawing (AutoCAD) plan of the premises.

In the end the plan will be with these details.

CERTIFIED:  Engineers & Electricians.

electrify solutions.co.uk

 Design Building Maintenance of Installations London

 

All inspections and testing are done with modern technology machines.We use the most modern software (generation) to fill electronic Electrical Certificates.

If you own a dwelling or flat, you must have.

Step 2.1 Design (drawing) calculation of each circuit: Where it will be clearly identified e.g.  calculation, Disconnection time, voltage drop maximum demand ………To comply the new regulation BS 7671:2018

You could call for a free estimate, from Step 1.1 & 1.3

Tel.  07453 007 167

Fire detection and Alarm System.
-It need drawing design.

-Separate Certificate.

Comments:
Reason for Ze verify? Verify the existence of supply earth.
Why Ze when C.U has been changed must be test?
-Different P.D now protecting circuit, must be confirmed disconnection times can be met
-When we change new Consumer Unit, will not comply with the disconnection time & will jump the Protective Devices
-Risk of the electric shock

-If the test is unsatisfactory, the owner must be, call & send this document to the supplier, they are responsible for solving this.